PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Installing steel angles for metal decking at Elev. 1,2,3  (2nd Floor) Facing West (800x600).jpg Installing steel angles for metal decking at Elev. 1,2,3 3rd Floor Facing West (800x600).jpg Laying out the foundation walls at column line 6.5 From G-C.7 Facing East (800x600).jpg Laying out the foundation walls at column line 6.5 From G-C.7 Facing South (800x600).jpg Metal Decking at Derrick -2 Facing North  (800x600).jpg Welding Derrick -1 Facing South-West (800x600).jpg
Previous pageNext page Metal Decking at Derrick -2 Facing North  (800x600)
Metal Decking at Derrick -2 Facing North (800x600)